Project Name:
ALUMINA REFINERY CONSTRUCTION PROJECT KETAPANG

Client : PT. Well Harvest Winning Alumina Refinery

Location : Mekar Utama Village, Ketapang Regency, West Kalimantan

Services : Civil

Priode : 2019

Value : IDR 8.220.091.784,00

Remarks : Completed

Description

This project consisted of dust collector (with corresponding pipeline and electrical) project; Dust collector project (This project is to increase the foundation of 6 alumina silo dust collectors at the wharf, which are located at 40m of 2 # and 3 # silos and 12m away from the bucket); Spare belt conveyor, reinforced steel beam and electrical construction; PE (Polyethylene) pipes reconstruction; Helipad and related roads construction.

Client : PT. China Harbour Indonesia

Location : Mekar Utama Village, Ketapang Regency, West Kalimantan

Services : Heavy Equipment

Priode : 2020

Value : IDR 180.000.000,00

Remarks : Completed

Description

Leasing 1 unit roller

Client : PT. Well Harvest Winning Alumina Refinery

Location : Mekar Utama Village, Ketapang Regency, West Kalimantan

Services : MEP

Priode : 2020

Value : IDR 320.000.000,00

Remarks : Completed

Description

Cable installation on the slope of the Munggu’s pole line 10kv

Client : PT. Well Harvest Winning Alumina Refinery

Location : Mekar Utama Village, Ketapang Regency, West Kalimantan

Services : MEP

Priode : 2020

Value : IDR 1.860.000.000,00

Remarks : Completed

Description

Modification Munggu’s water pipe line for Power Plant Division

Client : PT. Well Harvest Winning Alumina Refinery

Location : Mekar Utama Village, Ketapang Regency, West Kalimantan

Services : Civil

Priode : 2018

Value : IDR 11.049.574.703,00

Remarks : Completed

Description

This construction project consisted of several project such as: Production and installation of the company’s factory south, north gate, dock north gate, and red mud factory east gate; Equipment foundation work and equipment installation of coal conveyor belt system for coal system on power plant; Modification of steam pipeline in living area; Rust removal paint on the conveyor rack of the front dock; Trench reparation in the red mud plant, connection road of dangerous chemical warehouse construction, ground hardening and sporadic engineering in the newly hardened area of the alumina plant aluminum stack plant and roasting section; Adding color boards to alumina warehouse in the roasting section; Coal gas station #3-3 cloth bag duster outsourced inspection; Anticorrosion project; Adding desalination pipelines to alumina inspection section; Repair of power plant lines.

Client : PT. Well Harvest Winning Alumina Refinery

Location : Mekar Utama Village, Ketapang Regency, West Kalimantan

Services : MEP

Priode : 2020

Value : IDR 385.000.000,00

Remarks : Completed

Description

Working content disassembly, installation and removal of drum blower chute tong port silo